![]() |
|
|
|
|
#1 | |
|
Member
Join Date: Mar 2006
Location: Room 101, Glos. UK
Posts: 4,259
|
Quote:
Reminds me of a chemical plant construction project for Monsanto in Decatur, Alabama I was a project engineer on, My employer was responsible for the main plant inside the battery limits (IBL), another Co. did all the storage tanks & associated piping and pumping facilities outside the battery limits (OBL). At the point we met, turned out we were a few feet offline. The OBL people used metric, and we used USA 'English' coordinates. After scratching our heads, we connected with a nice zig-zag and called it a 'thermal expansion joint'. Everybody, including the client happy.
|
|
|
|
|
|
|
#2 | |
|
Member
Join Date: Apr 2017
Location: Sweden
Posts: 763
|
Quote:
|
|
|
|
|
|
|
#3 | |
|
Member
Join Date: Jan 2011
Posts: 1,138
|
Quote:
Yup, this happens! |
|
|
|
|
![]() |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|